Main Bridge Details (Technical)

  • Total 41nos.
    • 2 transition pier at landward ends and
    • 40 Center pier
  • 150 m each Composite Superstructure (Warren type Steel Truss Girder and Concrete on Upper Deck)

  • 41*150=6150 m = 6.150 km.Total 7 Nos Module:
    • 6 span in each 6 module
    • 5 span in one module
    • Racked (Inclined at 1H:6V) Steel Tubular driven pile
    • 6 Nos. In each pier
    • Pile Diameter = 3m
    • Pile Length = 128m
  • Total number of pile in Main Bridge:
    • Steel Pile = 40*6 = 240 nos
    • vertical bored concrete pile = 2×16 = 32 nos (upto 80m depth)
    • 22 m wide concrete deck slab (2.5 m hard shoulder on the both side)
    • 4 Lane road
  • Single Track Dual Gauge Rail

    13.6 m

    18.30 m

    • Mawa End (North Bank): 19+20 = 39 span; Length = 1478.03m
    • Janjira End (South Bank): 23+19 = 42 span; Length = 1670.03m
    • Total Road Viaduct: 81 span; Total Length= 3148.06m
    • Mawa End and Janjira End: 7+7 = 14 span; Length = 532m
    • 760mm dia Gas Transmission Line
    • 150mm dia Fiber optical & Telephone Duct
    • 7 nos High voltage Electric Line Platform in River over Pile Foundation at 2km downstream of Main Bridge